Planning & building control

We can provide local authorities with immediate planning and building control resilience support

We can provide local authorities with immediate planning and building control resilience support. Our service is designed for local authorities who need immediate solutions and a flexible service which can be switched on and off as required. More specifically, we can assist local authorities that do not have the in-house capacity to meet their service demands or the in-house capability and expertise to deal with certain planning requirements.

Find out more about our planning and building control services below:

Supporting local authorities with planning resource and expertise

Our planning policy team have a strong knowledge of existing and emerging national policy and how to apply this at a local level for your organisation

Our national pool of building control experts can provide immediate building control resilience support to local authorities who need immediate solutions and a flexible service which can be switched on and off as required

Our planning development team have the experience and expertise to support your organisation with its planning and development management needs

Our planning development team have the experience and expertise to support your organisation with its planning and development management needs

Providing planning resilience support to Warrington Borough Council

House-and-tools-reduced.jpg

The sheer volume of planning applications dealt with by Capita has been very impressive and helped us immensely during a period when our planning section was under severe pressure

Richard Evans, Principal Planner, Warrington Borough Council

Providing building control support to Lancaster City Council

Image 2.jpg

By adding extra capacity, Lancaster City Council was able to provide a high level of service to its customers

Lancaster City Council

Providing planning resilience support to The Royal Borough of Windsor and Maidenhead

Vision.jpg

By adding extra capacity, The Royal Borough of Windsor was able to maintain a high level of service to its customers by reducing planning application delays from backlogs.

The Royal Borough of Windsor